Tower Crane Dismantling Method Statement //free\\ Jun 2026
Remove tower/mast sections one by one. If using a climbing frame (telescoping cage), it is used to lower the top sections within reach of a mobile crane.
Prepared by: [Name, signature, position] Approved by: [Client/Principal Contractor signature, date] tower crane dismantling method statement
Position the mobile assist crane and set outriggers on spreader mats. Remove tower/mast sections one by one
The last piece to come down is the base mast section and the foundation anchor bolts. In many modern methods, the foundation is left in place (buried in the concrete slab) to avoid compromising the building’s waterproofing. The method statement must specify this: abandon in situ or remove and grout . The last piece to come down is the
This method statement covers the safe dismantling of a [Insert Crane Model] tower crane from a [Insert Site Address] construction site. The objective is to reduce the crane to manageable components using a mobile assist crane (or climbing crane/jib crane method) with zero incidents.
If the crane was on a reusable base, inspect for damage. If on an expendable anchor, shear the bolts and grout the surface. table to accompany this sequence?